Design Build Finance Operate: Difference between revisions

Line 3: Line 3:


==Delivery==
==Delivery==
Historically projects typically progressed under [[PFI]] and [[PPP]] arrangements, and accelerated with the introduction of the [[Waste Infrastructure Delivery Programme]] ([[WIDP]]) in 2006 intended to deliver [[residual waste]] [[treatment]] such as [[Energy from Waste]] plants. With this construction broadly completed, and with the grants available under the Waste Infrastructure Initiative now no longer available, the focus is currently on the operational phase and the delivery of value for money from existing contracts<ref>[https://larac.org.uk/news/waste-infrastructure-delivery-programme-moving-new-phase LARAC Web Article Nov 2019]</ref>.
Historically projects typically progressed under [[PFI]] and [[PPP]] arrangements, and accelerated with the introduction of the [[Waste Infrastructure Delivery Programme]] ([[WIDP]]) in 2006 intended to deliver [[residual waste]] [[treatment]] such as [[Energy from Waste]] plants. With this construction broadly completed, and with the grants available under the [[Waste Infrastructure Initiative]] ([[WI]]) now no longer available, the focus is currently on the operational phase and the delivery of value for money from existing contracts<ref>[https://larac.org.uk/news/waste-infrastructure-delivery-programme-moving-new-phase LARAC Web Article Nov 2019]</ref>.


==Contractual Arrangements<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/221036/pb13889-incineration-municipal-waste.pdf Reproduced with minor modifications from DEFRA 2013 Paper on Incineration of [[Municipal Solid Waste]]] Table 5</ref> ==
==Contractual Arrangements<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/221036/pb13889-incineration-municipal-waste.pdf Reproduced with minor modifications from DEFRA 2013 Paper on Incineration of [[Municipal Solid Waste]]] Table 5</ref> ==