Padeswood Cement Kiln: Difference between revisions

No edit summary
Bin52 (talk | contribs)
m change table order
Line 18: Line 18:
==Raw Materials==
==Raw Materials==
The primary raw materials are Carboniferous Limestone from Cefn Mawr Quarry, with coal measure shale and colliery waste from the Llay Main colliery tip, moving to Bersham Colliery in the future.
The primary raw materials are Carboniferous Limestone from Cefn Mawr Quarry, with coal measure shale and colliery waste from the Llay Main colliery tip, moving to Bersham Colliery in the future.
 
{{NHLFTable|Permit=BL1096IB}}
==Waste Used on Site==
The Padeswood site waste return to the [[EA]] for the most recent year showed the following wastes used on site:
{{EAIn|EPR=BL1096IB}}
{{EAIn|EPR=BL1096IB}}
{{NHLFTable|Permit=BL1096IB}}
The majority of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant. In 2015 the tonnage was almost exclusively for the use of fuel and included [[Cemfuel]] (liquid waste solvents) 13,422 tonnes, [[MBM]] 7,284 tonnes and [[SRF]] 19,007<ref>[https://www.hanson-communities.co.uk/en/search?keywords=padeswood Link to pdf on Hanson Website - 2015 Annual Performance Report for Padeswood]</ref>.
The majority of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant. In 2015 the tonnage was almost exclusively for the use of fuel and included [[Cemfuel]] (liquid waste solvents) 13,422 tonnes, [[MBM]] 7,284 tonnes and [[SRF]] 19,007<ref>[https://www.hanson-communities.co.uk/en/search?keywords=padeswood Link to pdf on Hanson Website - 2015 Annual Performance Report for Padeswood]</ref>.


==References==
==References==
<references />
<references />