South Clyde Energy Centre, Bogmoor Road, Glasgow: Difference between revisions

(add page specific text)
 
Line 10: Line 10:


==Construction==
==Construction==
The plant will be constructed under an [[EPCM]] arrangement with [[AFRY]] in co-operation with [[AFRY Solutions UK Ltd]] and [[AFRY Finland Oy]].  
The plant will be constructed under an [[EPCM]] arrangement with [[AFRY]] in co-operation with [[AFRY Solutions UK Ltd]] and [[AFRY Finland Oy]]. The [[grate]] and boiler was reported in July 2022 as beng delivered by [[Hitachi Zosen Inova Steinmüller]]<ref>https://www.letsrecycle.com/news/hzi-steinmuller-chosen-for-south-clyde-efw-plant/ Linked in Article accessed 22nd July 2022<ref>


==Waste Input==
==Waste Input==