A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan">[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|WP3738DE}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|WP3738DE}}
{{BiomassPlant|NAME=Tansterne|id=79|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Tansterne|id=79|EPR={{#var: epr}}}}
Line 4: Line 5:
<br clear="left" />
<br clear="left" />
==Summary==
==Summary==
A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan">[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.
A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan" />.


It was funded and developed by [[Solar 21]] in partnership with [[Heat Recovery Solutions]] (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in February 2018. The cost of the project was an estimated £35m<ref>[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>.
It was funded and developed by [[Solar 21]] in partnership with [[Heat Recovery Solutions]] (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in February 2018. The cost of the project was an estimated £35m<ref>[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>.
Line 17: Line 18:
The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.
The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant primarily [[Wood Waste]] but there is no tonnage reported in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> by [[Ofgem]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''142,057''' tonnes.