A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan">[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|WP3738DE}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|WP3738DE}} | ||
{{BiomassPlant|NAME=Tansterne|id=79|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Tansterne|id=79|EPR={{#var: epr}}}} | ||
Line 4: | Line 5: | ||
<br clear="left" /> | <br clear="left" /> | ||
==Summary== | ==Summary== | ||
A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan" | A [[Biomass Waste EFW]] facility located in Tansterne, near Hull, which is based processing up to 150,000 tonnes per annum of [[Wood Waste]] generating 22MW of electricity to the grid<ref name="Tan" />. | ||
It was funded and developed by [[Solar 21]] in partnership with [[Heat Recovery Solutions]] (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in February 2018. The cost of the project was an estimated £35m<ref>[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>. | It was funded and developed by [[Solar 21]] in partnership with [[Heat Recovery Solutions]] (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in February 2018. The cost of the project was an estimated £35m<ref>[https://bioenergyinternational.com/heat-power/hrs-start-work-35-million-tansterne-biomass-power-plant/ Bioenergy International]</ref>. | ||
Line 17: | Line 18: | ||
The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>. | The plant has been built to be '[[CHP]] ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achievable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>. | ||