Landfill Directive: Difference between revisions

(Added reference)
m (Added reference)
Line 5: Line 5:
* [[Non-hazardous Landfill]]
* [[Non-hazardous Landfill]]
* [[Hazardous Landfill]]
* [[Hazardous Landfill]]
* [[Inert Landfill]]
* [[Inert Landfill]]<ref name="foo" />.


The Directive also requires, that a strategy on biodegradable waste is put in place that achieves the progressive diversion of biodegradable municipal waste from landfill (Articles 5(1) & (2)). This requirement has been implemented in England through Waste Strategy 2007 and across the UK through the Waste and Emissions Trading Act 2003<ref name="foo" />.
The Directive also requires, that a strategy on biodegradable waste is put in place that achieves the progressive diversion of biodegradable municipal waste from landfill (Articles 5(1) & (2)). This requirement has been implemented in England through Waste Strategy 2007 and across the UK through the Waste and Emissions Trading Act 2003<ref name="foo" />.