Environmental Permitting: Difference between revisions

No edit summary
No edit summary
Line 41: Line 41:
'Installations' are then sub-divided as either A(1), A(2) or B installations depending on the type of 'activity' operated on site.
'Installations' are then sub-divided as either A(1), A(2) or B installations depending on the type of 'activity' operated on site.


All activities, installations and mobile plants and the list as to whether they are A(1), A (2) or B permits can be found within Schedule 1 of the [[Environmental Permitting Regulations 2010]] as amended.
All activities, installations and mobile plants and the list as to whether they are A(1), A (2) or B permits can be found within Schedule 1 of the [[Environmental Permitting (England and Wales) Regulations 2010]] as amended.


A1 installations are facilities which carry out industrial processes like refineries, food and drink factories and intensive farming activities. They also include certain waste activities like disposing of waste to [[landfill]], [[hazardous waste]] treatment and waste1 [[incineration]], [[gasification]] and [[pyrolysis]].  
A1 installations are facilities which carry out industrial processes like refineries, food and drink factories and intensive farming activities. They also include certain waste activities like disposing of waste to [[landfill]], [[hazardous waste]] treatment and waste1 [[incineration]], [[gasification]] and [[pyrolysis]].