Environmental Permitting: Difference between revisions
No edit summary |
No edit summary |
||
Line 41: | Line 41: | ||
'Installations' are then sub-divided as either A(1), A(2) or B installations depending on the type of 'activity' operated on site. | 'Installations' are then sub-divided as either A(1), A(2) or B installations depending on the type of 'activity' operated on site. | ||
All activities, installations and mobile plants and the list as to whether they are A(1), A (2) or B permits can be found within Schedule 1 of the [[Environmental Permitting Regulations 2010]] as amended. | All activities, installations and mobile plants and the list as to whether they are A(1), A (2) or B permits can be found within Schedule 1 of the [[Environmental Permitting (England and Wales) Regulations 2010]] as amended. | ||
A1 installations are facilities which carry out industrial processes like refineries, food and drink factories and intensive farming activities. They also include certain waste activities like disposing of waste to [[landfill]], [[hazardous waste]] treatment and waste1 [[incineration]], [[gasification]] and [[pyrolysis]]. | A1 installations are facilities which carry out industrial processes like refineries, food and drink factories and intensive farming activities. They also include certain waste activities like disposing of waste to [[landfill]], [[hazardous waste]] treatment and waste1 [[incineration]], [[gasification]] and [[pyrolysis]]. |