Environmental Permitting: Difference between revisions

No edit summary
m (Typos)
Line 43: Line 43:
All activities, installations and mobile plants and the list as to whether they are A(1), A (2) or B permits can be found within Schedule 1 of the [[Environmental Permitting (England and Wales) Regulations 2010]] as amended.
All activities, installations and mobile plants and the list as to whether they are A(1), A (2) or B permits can be found within Schedule 1 of the [[Environmental Permitting (England and Wales) Regulations 2010]] as amended.


A1 installations are facilities which carry out industrial processes like refineries, food and drink factories and intensive farming activities. They also include certain waste activities like disposing of waste to [[landfill]], [[Hazardous Waste]] treatment and waste1 [[incineration]], [[gasification]] and [[pyrolysis]].  
A1 installations are facilities which carry out industrial processes like refineries, food and drink factories and intensive farming activities. They also include certain waste activities like disposing of waste to [[landfill]], [[Hazardous Waste]] treatment and waste [[incineration]], [[gasification]] and [[pyrolysis]].  


All A(1) Permits are regulated by the [[Environment Agency]] in England and [[Natural Resources Wales]] in Wales. (Scotland and Northern Ireland continue to operate under a slightly different regime).
All A(1) Permits are regulated by the [[Environment Agency]] in England and [[Natural Resources Wales]] in Wales. (Scotland and Northern Ireland continue to operate under a slightly different regime).