Public Private Partnership: Difference between revisions

m (Update links)
m (Re-wording of text)
Line 6: Line 6:
Some [[PPP]] contracts are currently under review by [[Waste Disposal Authorities]] but more so for movement out of [[PFI]] after consideration of the cost benefit of continuing with the contract, and several have already been removed (i.e. Lancashire) or have had closed with major restructure (i.e. Sheffield and Greater Manchester).
Some [[PPP]] contracts are currently under review by [[Waste Disposal Authorities]] but more so for movement out of [[PFI]] after consideration of the cost benefit of continuing with the contract, and several have already been removed (i.e. Lancashire) or have had closed with major restructure (i.e. Sheffield and Greater Manchester).


The table below is an extract from DEFRA data <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)]</ref>  summarizing the residual waste projects that are/were [[PPP]] projects with additional commentary/notes added (with [[PFI]] projects separately listed in the [[PFI]] page) :
The table below is an extract from DEFRA data <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)]</ref>  summarizing the residual waste projects in England that are/were [[PPP]] projects. Additional commentary/notes have also been included (with [[PFI]] projects separately listed in the [[PFI]] page) :


{| class="wikitable"
{| class="wikitable"