Stevens Croft: Difference between revisions
No edit summary |
|||
Line 1: | Line 1: | ||
==Summary== | ==Summary== | ||
A Biomass Waste EFW facility based on 480,000 tonnes per annum of [[Wood Waste]] generating 44MWe to the grid <ref name="SC">[https://www.mottmac.com/article/2282/stevens-croft-biomass-power-station-uk/ Mott MacDonald]</ref>. The plant was developed and is owned by E.ON UK and cost an estimated €132m<ref name="tech">[https://www.power-technology.com/projects/stevenscroftbiomass/ Power Technology]</ref>. | A Biomass Waste EFW CHP facility based on 480,000 tonnes per annum of [[Wood Waste]] generating 44MWe to the grid <ref name="SC">[https://www.mottmac.com/article/2282/stevens-croft-biomass-power-station-uk/ Mott MacDonald]</ref>. The plant was developed and is owned by E.ON UK and cost an estimated €132m<ref name="tech">[https://www.power-technology.com/projects/stevenscroftbiomass/ Power Technology]</ref>. | ||
Steven's Croft in Lockerbie Scotland, is the UK's largest wood fired biomass facility, with an output of 44 MW, the facility supplies c. 70,000 homes, displacing 140,000 tonnes of greenhouse gases<ref name="SC" />. | Steven's Croft in Lockerbie Scotland, is the UK's largest wood fired biomass facility, with an output of 44 MW, the facility supplies c. 70,000 homes, displacing 140,000 tonnes of greenhouse gases<ref name="SC" />. |