Stevens Croft: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 16: | Line 16: | ||
Construction of the facility at Steven's Croft not only included the biomass plant but a fuel processing facility and 26km of underground electrical cable connecting the plant to Chapel Cross electriclal sub-station<ref name="SC" />. The fuel processing facility was designed to blend all the various sources of fuel mentioned above into one homogeneous material. It includes up to 14 days of round wood storage, a facility for reception of pre-chipped fuel, up to 6000m3 of covered chipped fuel storage, a round wood chipping facility, fuel reclamation and forwarding equipment with systems for final preparation of the fuel before delivery to the power plant.<ref name="SC" /> | Construction of the facility at Steven's Croft not only included the biomass plant but a fuel processing facility and 26km of underground electrical cable connecting the plant to Chapel Cross electriclal sub-station<ref name="SC" />. The fuel processing facility was designed to blend all the various sources of fuel mentioned above into one homogeneous material. It includes up to 14 days of round wood storage, a facility for reception of pre-chipped fuel, up to 6000m3 of covered chipped fuel storage, a round wood chipping facility, fuel reclamation and forwarding equipment with systems for final preparation of the fuel before delivery to the power plant.<ref name="SC" /> | ||
The facility also provides electricity to its fuel provider AW Jenkinsons and | The facility also provides electricity to its fuel provider AW Jenkinsons and supplies heat to the neighbouring sawmill, James Jones and Sons<ref>[https://www.eonenergy.com/About-eon/our-company/generation/our-current-portfolio/biomass/stevens-croft/ E.ON]</ref>. | ||
==Plant== | ==Plant== |