==Plant== | ==Plant== | ||
Marchinch Biomass Power Plant uses CHP technology which generates both electricity and heat simultaneously and in so | Marchinch Biomass Power Plant uses CHP technology which generates both electricity and heat simultaneously and in doing so generates up to 20% in energy savings<ref name="POW" />. The technology uses a fluidised bed boiler and flue gas systems<ref name="POW" />. | ||
Metso power was awarded a contract worth £75m for the delivery of a 155MWth circulating fluidised bed boiler and flue gas treatment plant. Aker Solutions were awarded a £115m contract to provide engineering, procurement and construction (EPC) and project managment. It was also responsible for the design, supply, construction, installation and commissioning of the plant<ref name="POW" />. | |||