Markinch Biomass CHP Plant: Difference between revisions
Addition of text. |
m minor text changes |
||
Line 1: | Line 1: | ||
[[Category: Biomass EfW Plants]] | [[Category: Biomass EfW Plants]] | ||
{{BiomassPlant|NAME=Markinch Biomass CHP Plant|id=56}} | {{BiomassPlant|NAME=Markinch Biomass CHP Plant|id=56}} | ||
[[File:RWE-BIOMASS-PLANT-618x355.jpg|400px|left|RWE's Markinch Biomass CHP: source papnews.com]]__TOC__ | |||
<br clear='left'/> | |||
==Summary== | ==Summary== | ||
Line 20: | Line 22: | ||
Metso power was awarded a contract worth £75m for the delivery of a 155MWth circulating fluidised bed boiler and flue gas treatment plant. Aker Solutions were awarded a £115m contract to provide engineering, procurement and construction (EPC) and project managment. It was also responsible for the design, supply, construction, installation and commissioning of the plant<ref name="POW" />. | Metso power was awarded a contract worth £75m for the delivery of a 155MWth circulating fluidised bed boiler and flue gas treatment plant. Aker Solutions were awarded a £115m contract to provide engineering, procurement and construction (EPC) and project managment. It was also responsible for the design, supply, construction, installation and commissioning of the plant<ref name="POW" />. | ||
== | ==References== |