Markinch Biomass CHP Plant: Difference between revisions

Northern Chick (talk | contribs)
Addition of text.
Bin52 (talk | contribs)
m minor text changes
Line 1: Line 1:
[[Category: Biomass EfW Plants]]
[[Category: Biomass EfW Plants]]
{{BiomassPlant|NAME=Markinch Biomass CHP Plant|id=56}}
{{BiomassPlant|NAME=Markinch Biomass CHP Plant|id=56}}
[[File:RWE-BIOMASS-PLANT-618x355.jpg|400px|left|RWE's Markinch Biomass CHP: source papnews.com]]__TOC__
<br clear='left'/>


==Summary==
==Summary==
Line 20: Line 22:
Metso power was awarded a contract worth £75m for the delivery of a 155MWth circulating fluidised bed boiler and flue gas treatment plant. Aker Solutions were awarded a £115m contract to provide engineering, procurement and construction (EPC) and project managment. It was also responsible for the design, supply, construction, installation and commissioning of the plant<ref name="POW" />.
Metso power was awarded a contract worth £75m for the delivery of a 155MWth circulating fluidised bed boiler and flue gas treatment plant. Aker Solutions were awarded a £115m contract to provide engineering, procurement and construction (EPC) and project managment. It was also responsible for the design, supply, construction, installation and commissioning of the plant<ref name="POW" />.


==Refernces=
==References==