Residual Waste EFW: Difference between revisions

m (moved section of text to new page)
Line 123: Line 123:
==Under Construction EfW==
==Under Construction EfW==
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy |from=efwdb |where=status='Under Construction' OR status='Comissioning' |data=site=site,id=id,cap=cap}}
{{#get_db_data: db=engy |from=efwdb |where=status='Under Construction'|data=site=site,id=id,cap=cap}}
The following list summarizes all [[EfW]] sites that were under construction January 2020, with limited summary information in the table and more detailed information by clicking through to the site-specific page . Historically there have been some plants that have not passed from construction to operation due to commissioning issues and are not listed i.e. [[Air Products]]. Several of the plants listed below that are presently in extended commissioning are based on [[Gasification]] technologies, but no comment is made as to whether they will reach full operational capacity.
The following list summarizes all [[EfW]] sites that were under construction January 2020, with limited summary information in the table and more detailed information by clicking through to the site-specific page . Historically there have been some plants that have not passed from construction to operation due to commissioning issues and are not listed i.e. [[Air Products]]. Several of the plants listed below that are presently in extended commissioning are based on [[Gasification]] technologies, but no comment is made as to whether they will reach full operational capacity.