Landfill: Difference between revisions

MCWaste (talk | contribs)
No edit summary
MCWaste (talk | contribs)
mNo edit summary
Line 12: Line 12:
In June 2018 a revised target was published as part of the [[Circular Economy Package]] and transposed into European Directive 2018/850 amending Directive 1999/31/EC on the landfill of waste which requires that by 2035 the amount of municipal waste landfilled is 10% or less of the total amount of municipal waste generated (by weight).
In June 2018 a revised target was published as part of the [[Circular Economy Package]] and transposed into European Directive 2018/850 amending Directive 1999/31/EC on the landfill of waste which requires that by 2035 the amount of municipal waste landfilled is 10% or less of the total amount of municipal waste generated (by weight).


Where the economic or environmental benefits are large enough, the process of [[Landfill Mining]] is being more commonly implemented at landfill sites<ref name="foo">National Infrastructure Commission (2018). National Infrastructure Assessment: Waste Infrastructure Analysis for England Main Report. Oxford: Anthesis Consulting Group, 2018.</ref>.
Where the economic, environmental or health benefits are large enough, the process of [[Landfill Mining]] is being more commonly implemented at landfill sites<ref name="foo">National Infrastructure Commission (2018). National Infrastructure Assessment: Waste Infrastructure Analysis for England Main Report. Oxford: Anthesis Consulting Group, 2018.</ref>.


==References==
==References==
<references/>
<references/>