Landfill: Difference between revisions

Howard (talk | contribs)
Howard (talk | contribs)
Line 116: Line 116:
Landfill sites where all tipping has ceased and the all infrastructure for post-closure management has been installed are deemed "closed" following agreement with the EA.
Landfill sites where all tipping has ceased and the all infrastructure for post-closure management has been installed are deemed "closed" following agreement with the EA.


The landfill operator is required to continue to maintain monitoring and management of the site post-closure until it can be shown to the satisfaction of the EA that the active management of the site by the operator is no longer required. Assessment of such a state is measured against criteria identified in WMP 26A and subsequent EA guidance. It is generally accepted for non-hazardous landfill sites that this is unlikely to be able to shown for at least 60 years post-closure, probably somewhat longer.
The landfill operator is required to continue to maintain monitoring and management of the site post-closure until it can be shown to the satisfaction of the EA that the active management of the site by the operator is no longer required. Assessment of such a state is measured against criteria identified in WMP 26A and subsequent EA guidance. It is generally accepted for non-hazardous landfill sites that this is unlikely to be able to shown for at least 60 years post-closure, probably somewhat longer.<br>
 
=== Settlement and Surcharge ===<br>
=== Settlement and Surcharge ===<br>
<br>
<br>