Construction and Demolition Waste: Difference between revisions

Imported from text file
Bin52 (talk | contribs)
add page specific text
Line 1: Line 1:
[[Category:Tonnage & Waste Types]]
[[Category:Tonnage & Waste Types]]
Under the [[Waste Framework Directive]] there is a target to for the [[Recovery]] of non-hazardous C&D waste of 70% by 2020, which the UK is currently meeting even taking into consideration the high level of uncertainty around the absolute tonnage figures. The figures for England and the UK are extracted in the table below from the [[DEFRA]] Digest <ref> digest</ref>
[[File:C&D Recovery Rates from digest.png|frame|center|C&D Waste Recovery Rates 2010 to 2016]]
== References ==