Stoke-on-Trent EfW: Difference between revisions

add page specific text
m (add picture and link)
(add page specific text)
Line 4: Line 4:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum, operated and owned by [[MES Environmental]], part of the [[CNIM]] Group. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/stoke/ MSES Website]</ref>.


==History==
==History==
The Stoke facility was built to primarily service residual [[Household Waste]] from [[Stoke on Trent City Council]] under a long term [[PPP]] contract and has been operational since 1997.


==Plant==
==Plant==
The plant comprises two lines via standard combustion CNIM boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 12.5 tonnes per hour or up to 205,000 tonnes per annum and generating 15 MWe.


==Local Authority Users==
==Local Authority Users==
banneredit
3,639

edits