Isle of Wight Waste Recovery Park: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
add page specific text
Northern Chick (talk | contribs)
Line 3: Line 3:


==Summary==
==Summary==
An integrated [[EfW]] facility with other treatment technologies at the Isle of Wight site in Newport, the original plan was to retrofit the old [[EfW]] facility with new [[Gasification]] technology. After complications with the retrofit process the technology was changed in 2017 to a conventional combustion process technology. The [[EfW]] element of the facility at the Isle of Wight has permitted operational capacity of 44,000 tonnes per annum, and has been developed, and will be operated by, [[AmeyCespa]] under its long term [[PPP]] contract with the [[Isle of Wight]].  
An integrated [[EfW]] facility with other treatment technologies at the Isle of Wight site in Newport, the original plan was to retrofit the old [[EfW]] facility with new [[Gasification]] technology. After complications with the retrofit process the technology was changed in 2017 to a conventional combustion process technology. The [[EfW]] element of the Isle of Wight facility has a permitted operational capacity of 44,000 tonnes per annum, and has been developed, and will be operated by, [[AmeyCespa]] under its long term [[PPP]] contract with the [[Isle of Wight]].


==Technology==
==Technology==

Revision as of 13:28, 25 February 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An integrated EfW facility with other treatment technologies at the Isle of Wight site in Newport, the original plan was to retrofit the old EfW facility with new Gasification technology. After complications with the retrofit process the technology was changed in 2017 to a conventional combustion process technology. The EfW element of the Isle of Wight facility has a permitted operational capacity of 44,000 tonnes per annum, and has been developed, and will be operated by, AmeyCespa under its long term PPP contract with the Isle of Wight.

Technology

The original Gasification approach was based upon the Energos technology. The new solution is a two-stage conventional combustion approach on a fixed grate by Michaelis Environmental Technology[1].

Construction

The new technology approach commenced construction in 2017 and was forecast for completion in spring 2019[2]. No other detail on the commissioning and operational status is available in the public domain at present.

Waste Input

The input material is residual Household Waste under the PPP with the Isle of Wight and some local residual Commercial Waste.

References