Troon: Difference between revisions

From WikiWaste
(add page specific text)
 
m (add picture and link)
Line 1: Line 1:
[[File:Pic of Troon EFW.png|400px|left|Troon Waste Wood EFW, source Urbas]]
[[File:Pic of Troon EFW.png|400px|left|Troon Waste Wood EFW, source Urbas]]
{{BiomassPlant|NAME=Troon|id=84}}
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]



Revision as of 07:28, 3 April 2020

Troon Waste Wood EFW, source Urbas
Troon Waste Wood EFW, source Urbas


Troon
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Adam Wilson
Capacity 2.6 MWe
Feedstock Waste Wood
EPR (Waste Licence)
ROC Yes
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN




Summary

A Biomass Waste EFW facility based on c. 25,000 tonnes per annum of Wood Waste generating 2.5MWe to the grid (or 2.33MWe and 10.9MWth)[1].

The Troon site was developed by Glennon Brothers Ltd to process residues from their adjacent sawmill, one of the largest in the UK, and provide heat to dry processed wood and has been operating since 2017. It is located in Troon harbour, at the old Adam Wilson & Sons Sawmill.

Plant

The project was delivered by URBAS Energietechnik, using their combustion grate technology[2] at a reported capital cost of £14m[3].

Local Authority Users

The plant utilizes Wood Waste from an adjacent sawmill, and receives no local authority wood.

References