Chilton Power Station: Difference between revisions

From WikiWaste
No edit summary
No edit summary
Line 18: Line 18:
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites<ref name="ref1" >Lets Recycle, 2011. [https://www.letsrecycle.com/news/latest-news/dalkias-40m-biomass-plant-nears-completion/ Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020].]</ref>.  
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites<ref name="ref1" >Lets Recycle, 2011. [https://www.letsrecycle.com/news/latest-news/dalkias-40m-biomass-plant-nears-completion/ Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020].]</ref>.  


The facility has been built and is being operated by Dalkias, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011<ref name="ref1 />.  
The facility has been developed, built and continues to be operated by Dalkias, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011<ref name="ref1 />.  


==Plant==
==Plant==

Revision as of 02:29, 7 April 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Chilton Biomass EfW. Lets Recycle, 2011.
Chilton Biomass EfW. Lets Recycle, 2011.







Summary

A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of Wood Waste to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites[1].

The facility has been developed, built and continues to be operated by Dalkias, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011[1].

Plant

The facility cost £40 million to develop[1].


Local Authority Users

References