In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. | In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility. | ||
==Refernces== | ==Refernces== |
Revision as of 12:51, 8 April 2020
Summary
A Biomass Waste EFW facility based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid and located in Tansterne near Hull.[1]
It is operated by Solar 21 and became fully operational in Februaury 2018.
Plant
In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility.