Tansterne: Difference between revisions

Line 14: Line 14:


In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility<ref name="Tan" />.
In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility<ref name="Tan" />.
The plant has been built to be 'CHP ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achieveable without any modification to the installed system<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/657559/Tansterne_biomass_plant_permit.pdf/ Environmental Permit], EA</ref>.


==Refernces==
==Refernces==
banneredit
1,703

edits