Chilton Power Station: Difference between revisions

m
minor text changes
(Changed picture)
m (minor text changes)
Line 1: Line 1:
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Chilton|id=20}}
{{BiomassPlant|NAME=Chilton|id=20}}
[[File:Chilton Biomass Energy Centre County Durham - geograph.org.uk - 2430058.jpg|400px|left|Chilton Biomass EfW. Geograph, 2011.]]<ref>Robinson, P., 2011. [https://www.geograph.org.uk/photo/2430058 Chilton Biomass Energy Centre County Durham. Online. Geograph.org.uk. [Accessed 7 April 2020].]</ref>
[[File:Chilton Biomass Energy Centre County Durham - geograph.org.uk - 2430058.jpg|400px|left|Chilton Biomass EfW. Geograph, 2011.]]<ref>Robinson, P., 2011. [https://www.geograph.org.uk/photo/2430058 Chilton Biomass Energy Centre County Durham. Online. Geograph.org.uk. [Accessed 7 April 2020].]</ref>__TOC__
 
<br clear='left'/>
 
 
 
 
 
 
 
 
 


==Summary==
==Summary==
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites<ref name="ref1" >Lets Recycle, 2011. [https://www.letsrecycle.com/news/latest-news/dalkias-40m-biomass-plant-nears-completion/ Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020].]</ref>.  
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites<ref name="ref1" >Lets Recycle, 2011. [https://www.letsrecycle.com/news/latest-news/dalkias-40m-biomass-plant-nears-completion/ Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020].]</ref>.  


Line 20: Line 10:


==Plant==
==Plant==
The facility cost £40 million to develop<ref name="ref1" />.
The facility cost £40 million to develop<ref name="ref1" />.




==Local Authority Users==


==References==
==References==
<references/>
<references/>
banneredit
3,643

edits