Markley Group Biomass: Difference between revisions

From WikiWaste
(→‎Plant: Additonal text.)
m (minor text changes)
Line 1: Line 1:
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Markley Group Biomass|id=58}}
{{BiomassPlant|NAME=Markley Group Biomass|id=58}}
[[File:Premiere Kitchens Biomass Facility.jpg|300px|left|Premiere Kitchens Biomass Facility]]
[[File:Premiere Kitchens Biomass Facility.jpg|300px|left|Premiere Kitchens Biomass Facility]]__TOC__
<br clear="left"/>
<br clear="left"/>



Revision as of 03:10, 27 April 2020


Markley Group Biomass
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Markley Group (Premiere Kitchens)
Capacity 2.1 MWe
Feedstock Waste Wood
EPR (Waste Licence)
ROC No
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Premiere Kitchens Biomass Facility
Premiere Kitchens Biomass Facility


Summary

A biomass EFW located at Markey Group premises in Hardwicke, Gloucestershire which generates 2.1MW from c. 2,300 tonnes of waste wood from its commercial business[1].

In 2012, Gloucester based Markey Group opened a £1.1m biomass facility which runs on waste wood generated by the subsidiary of Markey Group, Premiere Kitchens[1]. Each year Premiere Kitchens creates approximately 2,350 tonnes of waste wood in the form of extracted chipboard dust and residual off-cuts, which is used in the plant to generate all of the heating and hot water required for the company's site at Hardwicke[1].

Following the installation of the biomass facility, Markey Group were able to remove its mains gas supply and as a result the company reduces its carbon emissions by more than c.1,200 tonnes per year[1].

Plant

The plant was commissioned by UK-based Indusvent Limited who were instructed to design, supply and install a complete turnkey project whcih included a dust extraction and filtration system for production machinery, a sealed chipboard dust and chips transportation system, a 300m3 storage silo with hydraulic moving floor discharge, shredding of off-cuts and burning of the collected material to provide hot water and heating for both the office and factory heating[2]. The system features a 2.1 MW hot water boiler manufactured by Danish based Justsen Energiteknik A/S[1]. The burning of the waste wood in the boiler is controlled automatically to maximise efficiency with results monitored both on site and at the manufacturers premises in Denmark[1].

Local Authority Users

As this is a private biomass boiler served only by offcuts from the commercial organisation it serves, there are no local authority users.

References