BSW Timber: Difference between revisions

From WikiWaste
mNo edit summary
No edit summary
Line 1: Line 1:
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=BSW Timber|id=17}}
{{BiomassPlant|NAME=BSW Timber|id=17}}{{#vardefine: epr|1448}}
[[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]]__TOC__
[[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]]__TOC__
<br clear='left'/>
<br clear='left'/>

Revision as of 03:39, 1 August 2022


BSW Timber
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator BSW Timber
Capacity 3.2 MWe
Feedstock Waste Wood
EPR (Waste Licence) 1448
ROC No
CfD
CHP Yes

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

BSW Timber Biomass EfW. BSW Timber, 2016.
BSW Timber Biomass EfW. BSW Timber, 2016.


[1]

Summary

A Biomass Waste combined heat and power (CHP) EFW facility utilising Wood Waste to generate 3.2 MW. The facility is located at the BSW sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices[2].

This facility was developed in partnership with Dallol Energy[2], and became operational in 2016[3].

Plant

The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia[2].

Tonnage Input/Fuel

The tonnage received by the plant is not reported in the most recent Annual Sustainability Report for 2018-19[4] by Ofgem or the SEPA data for the calendar year (i.e. January 2018 to December 2018).

References