Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2017 103325 0 0 0 103325
2018 117413 0 0 0 117413
2019 116234 0 0 0 116234
2020 106451 0 0 0 106451
2021 108601 0 0 0 108601
2022 108160 0 0 0 108160


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2017 4644 4.49% 1574 1.52%
2018 6444 5.49% 1476 1.26%
2019 5102 4.39% 1311 1.13%
2020 4064 3.82% 1267 1.19%
2021 4019 3.70% 1351 1.24%
2022 4021 3.72% 1512 1.40%

Chilton Biomass EfW. Geograph, 2011.
Chilton Biomass EfW. Geograph, 2011.

[1]


Summary

A Biomass Waste EFW facility utilising a feedstock of up to 120,000 tpa of Wood Waste to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham.

The facility has been developed, built and continues to be operated by Dalkia, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011[2].

Plant

The facility cost £40 million to develop[2]. It has a design capacity of 14 tonnes per hour with a maximum annual consumption of 120,000 tonnes. This is at a continuous rating of 312 tonnes per day based on an average CV of 15 MJ/kg. The anticipated availability of 7,800 to 8,000 hours per annum (89%)[3].

Tonnage Input/Fuel

The tonnage received by the plant in the most recent Annual Sustainability Report for 2018-19[4] was reported by Ofgem as follows:

Biomass Tonnage (2018-19)
Wood Waste 115,099
Other 0
Total 115,099

The Wood Waste is received from a variety of sources including old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from Waste Disposal Authority's civic amenity sites[2]. The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was 117,162 tonnes.