Blackburn Meadows Renewable Energy Plant: Difference between revisions
m Bin52 moved page Blackburn Meadows to Blackburn Meadows Renewable Energy Plant: updated database |
No edit summary |
||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|LP3131TA}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|LP3131TA}} | ||
{{BiomassPlant|NAME=Blackburn Meadows|id=15|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Blackburn Meadows Renewable Energy Plant|id=15|EPR={{#var: epr}}}} | ||
[[File:Blackburn-meadows--sheffield 06.jpg|400px|left|Blackburn Meadows. BDP, 2018.]]__TOC__ | [[File:Blackburn-meadows--sheffield 06.jpg|400px|left|Blackburn Meadows. BDP, 2018.]]__TOC__ | ||
<br clear='left'/> | <br clear='left'/> | ||
Line 17: | Line 17: | ||
The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020]].</ref>. It has an [[Andritz]] boiler. | The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020]].</ref>. It has an [[Andritz]] boiler. | ||
==Tonnage Input/Fuel== | ==Annual Sustainability Tonnage Input/Fuel== | ||
The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows: | The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows: | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 29: | Line 29: | ||
| Total||208,327 | | Total||208,327 | ||
|} | |} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references/> | <references/> |
Revision as of 10:28, 10 August 2022
Blackburn Meadows Renewable Energy Plant Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | E-On UK Blackburn Meados Ltd |
Capacity | 30 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | LP3131TA |
ROC | Yes |
CfD | |
CHP | Yes |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|---|---|---|---|---|
2017 | 202183 | 0 | 0 | 0 | 202183 |
2018 | 214135 | 0 | 0 | 0 | 214135 |
2019 | 200098 | 0 | 0 | 0 | 200098 |
2020 | 149665 | 0 | 0 | 0 | 149665 |
2021 | 207643 | 0 | 0 | 0 | 207643 |
2022 | 199548 | 0 | 0 | 0 | 199548 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2017 | 4500 | 2.23% | 5265 | 2.60% |
2018 | 3636 | 1.70% | 5324 | 2.49% |
2019 | 4463 | 2.23% | 5116 | 2.56% |
2020 | 3580 | 2.39% | 3968 | 2.65% |
2021 | 4084 | 1.97% | 5267 | 2.54% |
2022 | 4669 | 2.34% | 5207 | 2.61% |
Summary
A Biomass Waste combined heat and power (CHP) EFW facility utilising a feedstock of Wood Waste to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the Wood Waste is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works[2].
The Blackburn Meadows facility is operated by E.ON Energy and became operational in 2015 after beginning construction in 2011[3].
Plant
The facility had a 10 MW battery installed after it was awarded a contract to support the national grid’s stability requirements, which became operational in 2017[2].
The unique architectural work was undertaken by BDP, which includes an orange translucent clad boiler house that is internally illuminated[3].
The facility cost £120 million to develop[4]. It has an Andritz boiler.
Annual Sustainability Tonnage Input/Fuel
The tonnage received by the plant in the most recent Annual Sustainability Report for 2018-19[5] was reported by Ofgem as follows:
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 208,327 |
Other | 0 |
Total | 208,327 |
The query SELECT "tin" FROM "db_ea"."ea_ton_in" WHERE epr='LP3131TA' is invalid (Error : SSL SYSCALL error: EOF detected
Function: EDConnectorRdbms::fetch Query: SELECT "tin" FROM "db_ea"."ea_ton_in" WHERE epr='LP3131TA' ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit LP3131TA, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|
References
- ↑ Blackburn Meadows CHP Site PhotoAll Rights Reserved
- ↑ 2.0 2.1 E.ON, 2020. Blackburn Meadows | Business Case Studies | E.ON. Online. Eonenergy.com. [Accessed 6 April 2020].
- ↑ 3.0 3.1 BDP., 2018. Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020].
- ↑ Bioenergy Insight, 2014. E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020].
- ↑ Biomass Sustainability Dataset 2018-19