Private Finance Initiative: Difference between revisions
m add page specific text |
m expanded text |
||
Line 2: | Line 2: | ||
In its desire to stimulate investment in waste infrastructure, and underpin the diversion of [[BMW]] waste from [[Landfill]], the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by [[Waste Disposal Authorities]] needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after [[DEFRA]] assessed <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Waste Infrastructure Delivery Programme]</ref> that the [[BMW]] targets could be met with the infrastructure funded to that date, and several are currently being considered by [[Waste Disposal Authorities]] for movement out of PFI after consideration of the cost benefit of continuing with the contract. | In its desire to stimulate investment in waste infrastructure, and underpin the diversion of [[BMW]] waste from [[Landfill]], the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by [[Waste Disposal Authorities]] needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after [[DEFRA]] assessed <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Waste Infrastructure Delivery Programme]</ref> that the [[BMW]] targets could be met with the infrastructure funded to that date, and several are currently being considered by [[Waste Disposal Authorities]] for movement out of PFI after consideration of the cost benefit of continuing with the contract. | ||
The table below is an extract from DEFRA data <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)]</ref> summarizing the residual waste projects that are/were [[PFI]] and [[PPP]] projects: | The table below is an extract from DEFRA data <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)]</ref> summarizing the residual waste projects that are/were [[PFI]] and [[PPP]] projects with additional commentary/notes added: | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 8: | Line 8: | ||
! Location !! Project/Site !! Classification !! Status !! Capacity <ref> the capacity has been reproduced from the DEFRA data, but has not been verified in this table, and in some cases is known to be incorrect</ref> (ktpa) !! Plant Type !! Comment | ! Location !! Project/Site !! Classification !! Status !! Capacity <ref> the capacity has been reproduced from the DEFRA data, but has not been verified in this table, and in some cases is known to be incorrect</ref> (ktpa) !! Plant Type !! Comment | ||
|- | |- | ||
| Avonmouth || New Earth Solutions || [[PPP]] || Uncertain <ref> Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020</ref> || 372 || [[MBT]] || Bought out of administration by [[Beauparc]],currently services [[West of England]], contracts lost to [[Suez]] and [[Viridor]] from March 2020 | | Avonmouth || New Earth Solutions || [[PPP]] || Uncertain <ref> Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020</ref> || 372 || [[MBT]] || Bought out of administration by [[Beauparc]],currently services [[West of England Partnership | West of England]], contracts lost to [[Suez]] and [[Viridor]] from March 2020 | ||
|- | |- | ||
| Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed | | Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed | ||
Line 16: | Line 16: | ||
| Birmingham || [[Landor Street]] || [[PPP]] || Operational || 165 || MBT || Example | | Birmingham || [[Landor Street]] || [[PPP]] || Operational || 165 || MBT || Example | ||
|- | |- | ||
| Birmingham || [[Tyseley]] || [[PPP]] || Operational || 361 || [[EfW]] || [[Veolia]] site towards its end of life | | Birmingham || [[Tyseley]] || [[PPP]] || Operational || 361 || [[EfW]] || [[Veolia]] operated site, towards its end of life, contract to 2021(?), tender for new operator thereafter(?) | ||
|- | |- | ||
| Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || [[Viridor]] [[Laing]] consortium [[GMWA]] contract terminated 2017, now [[Suez]] from June 2019 for 7 years | | Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || [[Viridor]] [[Laing]] consortium [[Greater Manchester Combined Authority | GMWA]] contract terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Buckinghamshire || [[Greatmoor]] || [[PPP]] || Operational || 300 || [[EfW]] || [[FCC]] site | | Buckinghamshire || [[Greatmoor]] || [[PPP]] || Operational || 300 || [[EfW]] || [[FCC]] site | ||
Line 36: | Line 36: | ||
| Dudley || [[Lister Road]] || [[PPP]] || Operational || 93 || [[EfW]] || Example | | Dudley || [[Lister Road]] || [[PPP]] || Operational || 93 || [[EfW]] || Example | ||
|- | |- | ||
| [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[ELWA]], recently reported financial difficulty | | [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[East London Waste Disposal Authority | ELWA]], recently reported financial difficulty | ||
|- | |- | ||
| [[ELWA]] 2 || [[Jenkins Lane]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[ELWA]], recently reported financial difficulty | | [[ELWA]] 2 || [[Jenkins Lane]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[East London Waste Disposal Authority | ELWA]], recently reported financial difficulty | ||
|- | |- | ||
| East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]] | | East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]] | ||
|- | |- | ||
| Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || Contract operated by [[Urbaser Balfour Beatty]] servicing [[Essex County Council]] and [[Southend-on-Sea Council]], reported operational difficulties | | Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || Contract operated by [[Urbaser Balfour Beatty]] servicing [[Essex County Council]] and [[Southend-on-Sea Borough Council | Southend]], reported operational difficulties | ||
|- | |- | ||
| Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || [[Viridor]] site | | Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || [[Viridor]] site | ||
Line 50: | Line 50: | ||
| Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || Example | | Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || Example | ||
|- | |- | ||
| Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | | Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Runcorn Phase 1]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Viridor]] bought out [[Laing]] in Nov 2018 and continues to operate contract with [[GMWA]] to 2035 (with option to extend) despite termination of wider PFI | | Greater Manchester || [[Runcorn Phase 1]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Viridor]] bought out [[Laing]] in Nov 2018 and continues to operate contract with [[Greater Manchester Combined Authority | GMWA]] to 2035 (with option to extend) despite termination of wider PFI | ||
|- | |- | ||
| Greater Manchester || [[N. Manchester]] || [[PFI]] || Operational || 65 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | | Greater Manchester || [[N. Manchester]] || [[PFI]] || Operational || 65 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Oldham]] || [[PFI]] || Operational || 99|| [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | | Greater Manchester || [[Oldham]] || [[PFI]] || Operational || 99|| [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Salford]] || [[PFI]] || Operational || 73 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | | Greater Manchester || [[Salford]] || [[PFI]] || Operational || 73 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | | Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years | ||
|- | |- | ||
| Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Example | | Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Example | ||
Line 72: | Line 72: | ||
| Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational ||80 || [[MBT]] || Example | | Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational ||80 || [[MBT]] || Example | ||
|- | |- | ||
| Kent || [[Allington]] || [[PPP]] || Operational || 427 || [[EfW]] || [[FCC]] site servicing Kent County Council | | Kent || [[Allington]] || [[PPP]] || Operational || 427 || [[EfW]] || [[FCC]] site servicing primarily [[Kent County Council]] | ||
|- | |- | ||
| Kirklees || [[Vine Street]] || [[PFI]] || Operational || 127 || [[EfW]] || Example | | Kirklees || [[Vine Street]] || [[PFI]] || Operational || 127 || [[EfW]] || Example | ||
Line 78: | Line 78: | ||
| Colnbrook || [[Lakeside]] || [[PPP]] || Operational || 436 || [[EfW]] || [[Viridor]] and [[Grundon]] Joint Venture which will require moving to accommodate Heathrow 3rd runway | | Colnbrook || [[Lakeside]] || [[PPP]] || Operational || 436 || [[EfW]] || [[Viridor]] and [[Grundon]] Joint Venture which will require moving to accommodate Heathrow 3rd runway | ||
|- | |- | ||
| Leeds || [[Cross Green]] || [[PFI]] || Operational || 165 || [[EfW]] || [[Veolia]] | | Leeds || [[Cross Green]] || [[PFI]] || Operational || 165 || [[EfW]] || Site developed by [[Veolia]] on behalf of [[Leeds City Council]] under a 25 year contract to 2037 | ||
|- | |- | ||
| Leicstershire || [[Mowmacre Hill]] || [[PFI]] || Operational || 165 || [[EfW]] || Example | | Leicstershire || [[Mowmacre Hill]] || [[PFI]] || Operational || 165 || [[EfW]] || Example | ||
Line 88: | Line 88: | ||
| L.B. Southwark ||[[Old Kent Road]] || [[PFI]] || Operational || 100 || [[MBT]] || Example | | L.B. Southwark ||[[Old Kent Road]] || [[PFI]] || Operational || 100 || [[MBT]] || Example | ||
|- | |- | ||
| Merseyside || [[Wilton]] || [[PPP]] || Operational<ref name="op" /> || 440 || [[EfW]] || [[Suez]] site in Teeside, waste hauled by rail from Merseyside transfer station | | Merseyside || [[Wilton]] || [[PPP]] || Operational<ref name="op" /> || 440 || [[EfW]] || [[Suez]] site in Teeside, waste hauled by rail from Merseyside transfer station under contract with [[Merseyside Waste Disposal Authority | MWDA]] | ||
|- | |- | ||
| Milton Keynes || [[Wolverton]] || [[PPP]] || In Construction]] || 80 || [[EfW]] || Example | | Milton Keynes || [[Wolverton]] || [[PPP]] || In Construction]] || 80 || [[EfW]] || Example | ||
Line 96: | Line 96: | ||
| Newcastle || [[Byker/Ellington]] || [[PPP]] || Operational || 187 || [MBT]] || Example | | Newcastle || [[Byker/Ellington]] || [[PPP]] || Operational || 187 || [MBT]] || Example | ||
|- | |- | ||
| North London || [[Edmonton]] || [[PPP]] || Operational || 512 || [[EfW]] || [[NLWA]] site, currently going through planning process to be replaced as at end of life | | North London || [[Edmonton]] || [[PPP]] || Operational || 512 || [[EfW]] || [[North London Waste Disposal Authority | NLWA]] site, currently going through planning process to be replaced as at end of life | ||
|- | |- | ||
| North Somerset || [[BOOMECO Avonmouth]] || [[PPP]] || Operational || 50 || [[MBT]] || | | North Somerset || [[BOOMECO Avonmouth]] || [[PPP]] || Operational || 50 || [[MBT]] || [[Boomecho]] bought by [[Veolia]] out of administration, serviced [[North Somerset Council]] but based in Avonmouth Docks, [[RDF]] export focused | ||
|- | |- | ||
| North Yorkshire || [[Allerton]] || [[PPP]] || Operational<ref name="op" /> || 320 || [[EfW]] || Example | | North Yorkshire || [[Allerton]] || [[PPP]] || Operational<ref name="op" /> || 320 || [[EfW]] || Example | ||
Line 114: | Line 114: | ||
| Rugby || [[Malpass Farm]] || [[PPP]] || Operational || 200 || [[MBT]] || Example | | Rugby || [[Malpass Farm]] || [[PPP]] || Operational || 200 || [[MBT]] || Example | ||
|- | |- | ||
| Sheffield || [[Bernard Road]] || [[PPP]] || Operational || 207 || [[EfW]] || Was part of wider [[Veolia]] | | Sheffield || [[Bernard Road]] || [[PPP]] || Operational || 207 || [[EfW]] || Was part of wider 35 year contract with [[Veolia]] to 2036, now [[EfW]] contract only with termination of wider contract in 2017 | ||
|- | |- | ||
| Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || | | Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || Site developed by [[Veolia]] as part of a 25 year contract with Shropshire County Council | ||
|- | |- | ||
| S.E. London || [[SELCHP]] || [[PPP]] || Operational || 431 || [[EfW]] || [[Veolia]] site taking waste from [[Lewisham]], [[Greenwich]], [[Westminster]] and [[Bromley]] | | S.E. London || [[SELCHP]] || [[PPP]] || Operational || 431 || [[EfW]] || [[Veolia]] site taking waste from [[Lewisham London Borough Council | Lewisham]], [[Greenwich London Borough Council | Greenwich]], [[Westminster City Council | Westminster]] and [[Bromley London Borough Council | Bromley]] | ||
|- | |- | ||
| S. London || [[Beddington Lane]]|| [[PPP]] || Operational<ref name="op" /> ||300 || [[EfW]] || [[Viridor]] site | | S. London || [[Beddington Lane]]|| [[PPP]] || Operational<ref name="op" /> ||300 || [[EfW]] || [[Viridor]] site | ||
Line 130: | Line 130: | ||
| Southampton || [[Marchwood Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]] | | Southampton || [[Marchwood Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]] | ||
|- | |- | ||
| Staffordshire || [[Four Ashes]] || [[PFI]] || Operational || 325 || [[EfW]] || | | Staffordshire || [[Four Ashes]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Veolia]] operated site for [[Staffordshire County Council]], 25 year contract from July 2010, with inputs also from [[Sandwell Metropolitan Borough Council | Sandwell]], [[Warwickshire County Council | Warkwickshire]] and [[Walsall Metropolitan Borough Council | Walsall]] | ||
|- | |- | ||
| Stoke on Trent || [[Campbell Road]] || [[PPP]] || Operational || 174 || [[EfW]] || Example | | Stoke on Trent || [[Campbell Road]] || [[PPP]] || Operational || 174 || [[EfW]] || Example | ||
Line 142: | Line 142: | ||
| Wakefield || [[South Kirby]] || [[PFI]] || Operational || 146 || [[MBT]] || Example | | Wakefield || [[South Kirby]] || [[PFI]] || Operational || 146 || [[MBT]] || Example | ||
|- | |- | ||
| West London || [[Severnside Avonmouth]] || [[PPP]] || Operational || 350 || [[EfW]] || [[Suez]] site in Avonmouth, supplied by train from a transfer in West London for [[WLWA]], plus some local waste including [[West of England]] | | West London || [[Severnside Avonmouth]] || [[PPP]] || Operational || 350 || [[EfW]] || [[Suez]] site in Avonmouth, supplied by train from a transfer in West London for [[West London Waste Disposal Authority | WLWA]], plus some local waste including [[West of England Partnership | West of England]] | ||
|- | |- | ||
| West Sussex || [[Brookhurst Wood]] || [[PPP]] || In Construction || 327 || [[MBT]] || Example | | West Sussex || [[Brookhurst Wood]] || [[PPP]] || In Construction || 327 || [[MBT]] || Example | ||
|- | |- | ||
| Western Riverside || [[Belvedere]] || [[PPP]] || Operational || 688 || [[EfW]] || [[Cory]] site in Bexley, supplied by river from two transfer stations for [[WRWA]], plus some local tonnage for [[Bexely | | Western Riverside || [[Belvedere]] || [[PPP]] || Operational || 688 || [[EfW]] || [[Cory]] site in Bexley, supplied by river from two transfer stations for [[Western Riverside Waste Disposal Authority | WRWA]], plus some local tonnage for [[Bexley London Borough Council | Bexely]] | ||
|- | |- | ||
| Whites Pit, Poole || [[Canford]] || [[PPP]] || Operational || 50 || [[MBT]] || Example | | Whites Pit, Poole || [[Canford]] || [[PPP]] || Operational || 50 || [[MBT]] || Example |
Revision as of 18:41, 21 January 2020
In its desire to stimulate investment in waste infrastructure, and underpin the diversion of BMW waste from Landfill, the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by Waste Disposal Authorities needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after DEFRA assessed [1] that the BMW targets could be met with the infrastructure funded to that date, and several are currently being considered by Waste Disposal Authorities for movement out of PFI after consideration of the cost benefit of continuing with the contract.
The table below is an extract from DEFRA data [2] summarizing the residual waste projects that are/were PFI and PPP projects with additional commentary/notes added:
Location | Project/Site | Classification | Status | Capacity [3] (ktpa) | Plant Type | Comment |
---|---|---|---|---|---|---|
Avonmouth | New Earth Solutions | PPP | Uncertain [4] | 372 | MBT | Bought out of administration by Beauparc,currently services West of England, contracts lost to Suez and Viridor from March 2020 |
Avonmouth | New Earth Energy | PPP | Mothballed[5] | 73 | EfW | RDF from Avonmouth MBT fed this plant, technology failed, currently mothballed |
Basingstoke | Chineham | PPP | Operational | 99 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Birmingham | Landor Street | PPP | Operational | 165 | MBT | Example |
Birmingham | Tyseley | PPP | Operational | 361 | EfW | Veolia operated site, towards its end of life, contract to 2021(?), tender for new operator thereafter(?) |
Bolton | Raikes Lane | PFI | Operational | 86 | EfW | Viridor Laing consortium GMWA contract terminated 2017, now Suez from June 2019 for 7 years |
Buckinghamshire | Greatmoor | PPP | Operational | 300 | EfW | FCC site |
Cambridgeshire | Waterbeach | PFI | Operational[6] | 200 | MBT | Amey Cespa site with variable performance reported, planning being pursued for new EfW on the site |
Cornwall | St. Dennis | PFI | Operational | 240 | EfW | Suez site |
Coventry | Coventry EFW | PPP | Operational | 245 | EfW | Example |
Cumbria | Hespin Wood | PPP | Mothballed[5] | 66 | MBT | Example |
Cumbria | Barrow-in-Furness | PPP | Mothballed | 50 | MBT | Example |
Derbyshire | Sinfin Lane | PPP | In Construction | 190 | EfW | Recent termination of contract after delays in commissioning |
Dudley | Lister Road | PPP | Operational | 93 | EfW | Example |
ELWA 1 | Frog Island | PFI | Operational | 180 | MBT | Renewi site servicing ELWA, recently reported financial difficulty |
ELWA 2 | Jenkins Lane | PFI | Operational | 180 | MBT | Renewi site servicing ELWA, recently reported financial difficulty |
East Sussex | Newhaven | PFI | Operational | 234 | EfW | Servicing East Sussex County Council and Brighton and Hove City Council |
Essex | Courtauld Road | PFI | Operational[6] | 417 | MBT | Contract operated by Urbaser Balfour Beatty servicing Essex County Council and Southend, reported operational difficulties |
Exeter | Marsh Barton | PPP | Operational | 60 | EfW | Viridor site |
Ferrybridge | Multifuel 1 (FM1) | PPP | Operational | 400 | EfW | Example |
Gloucestershire | Javelin Park | PPP | Operational[6] | 190 | EfW | Example |
Greater Manchester | Longley Lane | PFI | Operational | 110 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Runcorn Phase 1 | PFI | Operational | 325 | EfW | Viridor bought out Laing in Nov 2018 and continues to operate contract with GMWA to 2035 (with option to extend) despite termination of wider PFI |
Greater Manchester | N. Manchester | PFI | Operational | 65 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Oldham | PFI | Operational | 99 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Salford | PFI | Operational | 73 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Greater Manchester | Stockport | PFI | Operational | 92 | MBT | Viridor Laing consortium contract with GMWA terminated 2017, now Suez from June 2019 for 7 years |
Hartlepool | Tees Valley Lines 1 &2 | PPP | Operational | 345 | EfW | Example |
Herefordshire | Hartlebury | PPP | In Construction | 200 | EfW | Example |
Hertfordshire | Hoddesdon | PPP | Post Close | 320 | EfW | Example |
Isle of Wight | Isle of Wight Gasification | PPP | In Construction | 40 | EfW | Example |
Isle of Wight | Isle of Wight WM Project | PPP | Operational | 80 | MBT | Example |
Kent | Allington | PPP | Operational | 427 | EfW | FCC site servicing primarily Kent County Council |
Kirklees | Vine Street | PFI | Operational | 127 | EfW | Example |
Colnbrook | Lakeside | PPP | Operational | 436 | EfW | Viridor and Grundon Joint Venture which will require moving to accommodate Heathrow 3rd runway |
Leeds | Cross Green | PFI | Operational | 165 | EfW | Site developed by Veolia on behalf of Leeds City Council under a 25 year contract to 2037 |
Leicstershire | Mowmacre Hill | PFI | Operational | 165 | EfW | Example |
Leicstershire | Cotesbach | PPP | Operational | 50 | MBT | Example |
Lincolnshire | North Hykeham | PPP | Operational | 154 | EfW | Example |
L.B. Southwark | Old Kent Road | PFI | Operational | 100 | MBT | Example |
Merseyside | Wilton | PPP | Operational[6] | 440 | EfW | Suez site in Teeside, waste hauled by rail from Merseyside transfer station under contract with MWDA |
Milton Keynes | Wolverton | PPP | In Construction]] | 80 | EfW | Example |
NE Lincolnshire | Stallingborough | PPP | Operational | 53 | EfW | Example |
Newcastle | Byker/Ellington | PPP | Operational | 187 | [MBT]] | Example |
North London | Edmonton | PPP | Operational | 512 | EfW | NLWA site, currently going through planning process to be replaced as at end of life |
North Somerset | BOOMECO Avonmouth | PPP | Operational | 50 | MBT | Boomecho bought by Veolia out of administration, serviced North Somerset Council but based in Avonmouth Docks, RDF export focused |
North Yorkshire | Allerton | PPP | Operational[6] | 320 | EfW | Example |
Nottingham | Eastcroft 3rd Line | PPP | Consented | 140 | EfW | Example |
Nottingham | Eastcroft | PPP | Operational | 158 | EfW | Example |
Oxfordshire | Ardley | PPP | Operational | 300 | EfW | Viridor site |
Peterborough | Fourth Drove, Fengate | PPP | Operational | 85 | EfW | Viridor site |
Portsmouth | Portsmouth Project Integra | PPP | Operational | 198 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Rugby | Malpass Farm | PPP | Operational | 200 | MBT | Example |
Sheffield | Bernard Road | PPP | Operational | 207 | EfW | Was part of wider 35 year contract with Veolia to 2036, now EfW contract only with termination of wider contract in 2017 |
Shropshire | Battlefield Enterprise Park | PFI | Operational | 90 | EfW | Site developed by Veolia as part of a 25 year contract with Shropshire County Council |
S.E. London | SELCHP | PPP | Operational | 431 | EfW | Veolia site taking waste from Lewisham, Greenwich, Westminster and Bromley |
S. London | Beddington Lane | PPP | Operational[6] | 300 | EfW | Viridor site |
South Tyne & Wear | Teeside Lines 4&5 | PFI | Operational | 256 | EfW | Example |
South Devon | Devonport | PFI | Operational | 245 | EfW | Am MVV project |
South Yorkshire | Bolton Road, Manvers | PFI | Operational | 286 | MBT | Example |
Southampton | Marchwood Project Integra | PPP | Operational | 198 | EfW | Veolia site for Hampshire County Council and partners under Project Integra |
Staffordshire | Four Ashes | PFI | Operational | 325 | EfW | Veolia operated site for Staffordshire County Council, 25 year contract from July 2010, with inputs also from Sandwell, Warkwickshire and Walsall |
Stoke on Trent | Campbell Road | PPP | Operational | 174 | EfW | Example |
Suffolk | Great Blakenham | PFI | Operational | 269 | EfW | Example |
Surrey | Charlton Lane Eco Park | PFI | In Construction | 60 | EfW | Example |
Swindon | Chaney Manor | PPP | Operational | 48 | MBT | Example |
Wakefield | South Kirby | PFI | Operational | 146 | MBT | Example |
West London | Severnside Avonmouth | PPP | Operational | 350 | EfW | Suez site in Avonmouth, supplied by train from a transfer in West London for WLWA, plus some local waste including West of England |
West Sussex | Brookhurst Wood | PPP | In Construction | 327 | MBT | Example |
Western Riverside | Belvedere | PPP | Operational | 688 | EfW | Cory site in Bexley, supplied by river from two transfer stations for WRWA, plus some local tonnage for Bexely |
Whites Pit, Poole | Canford | PPP | Operational | 50 | MBT | Example |
Wiltshire | Northacre Farm | PPP | Operational | 60 | MBT | Hills site at Westbury |
Wolverhampton | Crown Street EFW | PPP | Operational | 108 | EfW | Example |
References
- ↑ DEFRA Waste Infrastructure Delivery Programme
- ↑ DEFRA Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)
- ↑ the capacity has been reproduced from the DEFRA data, but has not been verified in this table, and in some cases is known to be incorrect
- ↑ Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020
- ↑ 5.0 5.1 In original data site was listed as operational this has been changed to Mothballed.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 In original data site was listed as In Construction this has been changed to Operational.