Ardley EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence FP3134GU
Operator Viridor
Region South East
Operational Capacity 326ktpa
Is site R1? Yes
When was R1 Granted? 2015-01-12
What was the R1 value 0.84
Electrical Capacity 26.90MWe
Number of Lines 2
Number of Turbines 1
CHP Yes
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 218970.00 84656.00 0.00 0.00 303626.00
2017 206033.00 84687.00 0.00 0.00 290720.00
2018 141737.00 148342.00 0.00 0.00 290079.00
2019 186417.00 93364.00 0.00 0.00 279781.00
2020 214334.00 75730.00 0.00 0.00 290064.00
2021 226512.00 107015.00 0.00 0.00 333527.00
2022 223490.00 93664.00 0.00 0.00 317154.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 54472.00 17.94% 6195.68 2.04%
2017 65412.00 22.50% 6105.12 2.10%
2018 59299.00 20.44% 6074.36 2.09%
2019 46795.00 16.73% 6006.00 2.15%
2020 49558.00 17.09% 6549.00 2.26%
2021 67769.00 20.32% 7228.00 2.17%
2022 67267.00 21.21% 6344.00 2.00%