Margam Green Energy Plant

From Wikiwaste
Revision as of 14:25, 24 April 2020 by Bin52 (talk | contribs) (Update links)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Margam Green Energy Plant
Margam Green Energy Plant


Summary

A Biomass Waste EFW located near Port Talbot, South Wales, generating c. 40 MW[1] based on an annual combustion rate of c.335,000 tonnes of wood waste per annum[2].

The plant is owned by Glennmont Partners, a specialist clean energy investment fund which focuses on investment in clean energy infrastructure. Originally the Margam project was a joint venture between Cardiff based energy development company, Eco2 Ltd and a local company, Western Logs Group. Eco2 Ltd now has responsibility for the plants overall operations and fuel management supply[1]. The project was one of the final of its type to be supported under the Renewables Obligation [3].

The plant became operational in 2019 at a cost of c.£160m[1].

The Margam plant takes Wood Waste that is supplied by Stobart Biomass on a long term contract. The Wood Waste is sourced and supplied by Stobart Biomass from across the country at a rate of approximately 6,000 tonnes per week[1]. The plant is also capable of processing contaminated wood and fuel containing metals with no pre-treatment required. The facility is also able to take municipal waste as a fuel source in the future if required[2].

Plant

The main EPC contractor was the consortium of [[Babcock Wilcox VØlund] a/s]] (BWV) and Interserve Construction Ltd. VØlund is part of the Babcock & Wilcox Group, and provided the process equipment whilst Interserve (Wales) undertook the civil engineering and building. BWV have the responsibility for the plant’s operations and maintenance[1] for the next 15 years[2].

The plant features the patented advanced DynaGrate® technology which can handle a wide range of waste and is based on the Bruun & Sørensen technology.[2].


References