Lancing Biomass Plant

From Wikiwaste
Revision as of 13:33, 17 April 2020 by MCWaste (talk | contribs)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

A Biomass EfW facility based on consuming 40,000 tonnes per annum of mainly waste wood feedstock to produce 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste[1].

The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd[2].

Plant

The facility cost £10m to develop[1] and is collocated with recycling operations[2].