Templeborough Biomass Power Plant

From WikiWaste
Revision as of 06:34, 9 August 2022 by Bin52 (talk | contribs)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 67486 0 0 0 67486
2019 207916 0 0 0 207916
2020 240778 0 0 0 240778
2021 297951 0 0 0 297951
2022 251678 0 0 0 251678


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 4241 6.28% 1100 1.63%
2019 58449 28.11% 15005 7.22%
2020 11657 4.84% 4050 1.68%
2021 21747 7.30% 6143 2.06%
2022 19928 7.92% 6486 2.58%


Summary

A Biomass Waste CHP EfW facility based on up to 260,000 tonnes per annum of Wood Waste pellet generating 41 MWe[1]. The plant is located in Templeborough on the River Don, near Rotherham.

The Templeborough site was originally developed by Bright Partnerships who secured the site and the planning consent to develop the biomass facility. At financial close Copenhagen Infrastrucutre Partners (CIP), who provided the equity and debt finance for the scheme, purchased the project and setting up the new operating company Templeborough Biomass Power Plant Ltd[2]. In October 2019 London based Greencoat Capital announced that it had signed an agreement to acquire 100% of Templeborough Biomass Power Plant Ltd from CIP. This project is the company's first move into bioenergy assets[3].The total cost of the project was c.£200m GBP[4].

Plant

Templeborough Biomass Ltd contracted a consortium made up of Interserve Construction Ltd and Babcock & Wilcox Volund (B&W Volund) to build the power plant and supplied all the equipment. The latter company have also been awarded the contract to operate and maintain the facility for the 15 years following the commissioning of the plant[1].

B&W Volund offered a full turnkey solution to the project with the technology solution based upon their patented DynaGrate technology[2].

Tonnage Input/Fuel

The tonnage received by the plant is primarily Wood Waste but there is no tonnage reported in the most recent Annual Sustainability Report for 2018-19[5] by Ofgem. The Wood Waste tonnage received and recorded in the EA statistics for the calendar year (i.e. January 2018 to December 2018) was 68,643 tonnes.

References