Plymouth Timber Resource Recovery Plant

From WikiWaste
Revision as of 09:19, 7 April 2020 by MCWaste (talk | contribs) (Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=Birmingham Bio Power|id=14}} 400px|left|Dartmoor Biomass EfW. CoGen, 2018. ==...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Birmingham Bio Power
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Engie FM Limited
Capacity 10.3 MWe
Feedstock Waste Wood
EPR (Waste Licence) GP3509PX
ROC Yes
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Dartmoor Biomass EfW. CoGen, 2018.
Dartmoor Biomass EfW. CoGen, 2018.







Summary

A Biomass EfW facility based on 36,000 tonnes per annum of waste wood producing 4.3 MWe gross power. The facility is located in Plymouth, Devon, and the waste wood feedstock is locally sourced by a local waste timber aggregator. This facility benefits from a private wire arrangement and heat off-take to a large local business[1].

The facility was developed by CoGen who continues to provide management services[1].

Until 2019, the facilities operator was Zebec.

Plant

The facility utilises Nexterra’s gasification system technology, which is an Advanced Conversion Technology[1].

Local Authority Users

References