Ince Biomass Power Plant

From WikiWaste
Revision as of 09:48, 7 April 2020 by MCWaste (talk | contribs)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Ince Bio Power. CoGen, 2018.
Ince Bio Power. CoGen, 2018.







Summary

A Biomass EfW facility based on 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to nPower under a long-term Power Purchase Agreement. The facility is located at Protos in Cheshire, and forms part of Peel Environmental’s ‘Protos’ energy hub located near Ellesmere Port[1]. The waste wood feedstock is sourced locally through a feedstock contract with Ince Park Renewables[2].

The operations & maintenance for the facility is being carried out by Stantec[2]. Construction commenced in 2015 and Ince Bio Power becoming fully operational in March 2015[1].

Plant

The facility utilises Outotec’s fluidised bed advanced gasification technology, which is an Advanced Conversion Technology. The EPC services for the project were provided by a joint venture between MWH Treatment Limited and Black & Veatch Limited[2].

The construction and initial operations of the facility were managed by CoGen, and funding was provided by Bioenergy Infrastructure Group Limited[2].


Local Authority Users