Templeborough Biomass

From WikiWaste


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN


Summary

A Biomass Waste EfW facility based on c.350,000 tonnes per annum of waste wood pellet generating 41 MWe[1]

The Templeborough site was originally developed by Bright Partnerships who secured the site and the planning consent to develop the biomass facility. At financial close Copenhagen Infrastrucutre Partners (CIP) who provided the equity and debt finance for the scheme purchased the project, setting up the new operating company Templeborough Biomass Power Ltd[2]. In October 2019 however, London based Greencoat Capital announced that it had signed an agreement to acquire 100% of Templeborough Biomass Power Plant Ltd from CIP. This project is the company's first move into bioenergy assets[3].The total cost of the project was c.£200m GBP[4].

Plant

Templeborough Biomass Ltd contracted with a consortium made up of Interserve Construction Ltd and Babcock & Wilcox Volund (B&W Volund) who built the power plant and supplied all the equipment. The latter company have also been awarded the O&M contract to operate and maintain the facility for the 15 years following the comissioning of the plant[1].

B&W Volund offered a full turnkey solution to the project with the technology solution based upon their patented DynaGrate technology[2]