Sherwood Biomass

From WikiWaste
Revision as of 04:38, 14 April 2020 by Northern Chick (talk | contribs) (→‎Summmary: New text)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summmary

The Sherwood Biomass Waste CHP EFW facility is located in Widmerpool, Nottingham and generates 6.55MWe of electricity and up to 4.5 MWth of process heat which is supplied to the adjacent sawmill operations[1]. The plant uses c. 52,000 tonnes of waste wood per annum[2].

In 2015 Veolia secured a 20 year contract worth £50 million from Equitex ESI CHP to operate the Sherwood Biomass facility. Under the contract Veolia will provide operation and maintenance on a 24/7 basis and will deliver monitoring, reporting and compliance services[2]. The agreement also covers water treatment, emission monitoring and ash disposal[2].

Plant

The plant uses a traditional steam cycle for generating electricity through the combustion of life expired wastewood from local sources[2].

Plant

Local Authority Users

References

  1. Bioenergy News
  2. 2.0 2.1 2.2 2.3 Cite error: Invalid <ref> tag; no text was provided for refs named BIO