East Cambridge District Council

From Wikiwaste
Revision as of 14:23, 9 March 2021 by Admin (talk | contribs) (Page update changes)

East Cambridgeshire District

Demographic Information

GSSCode: E07000009

Authority Type: DIS[1]

Country: England

Region: Eastern

Disposal Authority: Cambridgeshire County Council

Population[2] 89,362
Land Area (ha)[3] 65,775.21
Population per ha 1.36



Collections Contract Information[4]

Collection Arrangements

Primary[5]

Residual Collection: Weekly

Dry Recycleables: Fortnightly : Comingled

  • Method of Segregation[6]: To be completed by Local Authority

Green Waste: Fortnightly : Comingled : Not Charged

Food Waste: Fortnightly : Comingled

Secondary[7]

Residual Collection: To be completed by Authority

Dry Recycleables: To be completed by Authority

  • Method of Segregation[6]: To be completed by Authority

Green Waste: To be completed by Authority

Food Waste: To be completed by Authority

Contract Arrangements

Residual Waste Collection: OutSourced (East Cambs Trading Co)

Mixed Recycling Collections: OutSourced (East Cambs Trading Co)

Organic Waste Collection: OutSourced (East Cambs Trading Co)

Food Waste Collection: OutSourced (East Cambs Trading Co)

Duration of Contract: 10

Contract Start Date: 2018

Approximate Value: £14,726,250

Comments

NA


Destination Information

Significant Tonnage Summary[8]

Stream Facility Operator Address Material Tonnes
Comingled recyclate Materials recovery facility Ameycespa (East) Ltd Ely Road, Waterbeach, Cambridge, Cambridgeshire NA 8229.83
Mixed green and food waste In vessel composting Ameycespa (East) Ltd Ely Road, Waterbeach, Cambridge, Cambridgeshire Mixed garden and food waste 10773.04

For further destination information see Disposal Authority (Cambridgeshire County Council.)

References

  1. Authority Type Abreviations:
    • UTA - Unitary Authority
    • DIS - District
    • MTD - Metropolitan District
    • LBO - London Borough
    • CTY - County Council
  2. Source: ONS mid 2018 projection
  3. Source: Ordnance Survey boundry line data 2019
  4. Data initially populated from propriatory database.
  5. These arrangements are for the primary arrangements in an area. Primary is defined as the arrangements given to the most households in an area.
  6. 6.0 6.1 This should detail the Kerbside Collection Scheme operated by the LA e.g. co-mingled, twin stream or source segregated.
  7. Due to the diverse nature of housing stock within a local authority's juristriction most LAs operate secondary collection arrangements to accommodate for this difference in housing e.g. houses, flats etc
  8. Tonnages under 2000 tonnes have been screened out.