Ellesmere Port Incinerator
The largest High Temperature Incinerator site in the UK, and one of the most advanced in Europe[1], is Veolia's Ellesmere Port Incinerator which recently celebrated its 30th anniversary[2].
Error: no local variable "site" has been set. | |
![]() See HT & Clin → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Operational Capacity | Error: no local variable "plated" has been set.tpa |
Number of Lines | Error: no local variable "line" has been set. |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Annual Report Data
Year | Total In | Total Clinical | IBA Out | ACP Out | Op Hours |
---|

Summary
Plant Description
Waste Reception & Storage
Energy Recovery
Gas Cleaning
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit BS5193IE, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|