Kings Weston Lane Clinical Waste Incinerator
Clinical Waste Incinerator operated by Clinipower and located on Kings Western Lane, Avonmouth, with an annual capacity limit of 6,800 tonnes.
Kings Weston Lane Clinical Waste Incinerator | |
See HT & Clin → page for a larger UK Wide map. | |
Waste Licence | FB3506SJ |
Operator | Clinipower |
Operational Capacity | 6,800tpa |
Number of Lines | |
Region | South West |
Annual Report Data
Year | Total In | Total Clinical | IBA Out | ACP Out | Op Hours
|
---|---|---|---|---|---|
2019 | |||||
2018 | |||||
2017 | |||||
2020 | 0 | 0 | 0 | 0 | 0 |
2021 | 0 | 0 | 0 | 0 | 0 |
2022 | 0 | 0 | 0 | 0 | 0 |
Summary
Clinical Waste Incinerator operated by Clinipower and located on Kings Western Lane, Avonmouth, with an annual capacity limit of 6,800 tonnes, based on pyrolysis.
Plant[1]
Text to follow
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit FB3506SJ, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|