BSW Timber

From Wikiwaste
Revision as of 09:39, 1 August 2022 by Bin52 (talk | contribs)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

BSW Timber Biomass EfW. BSW Timber, 2016.
BSW Timber Biomass EfW. BSW Timber, 2016.


[1]

Summary

A Biomass Waste combined heat and power (CHP) EFW facility utilising Wood Waste to generate 3.2 MW. The facility is located at the BSW sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices[2].

This facility was developed in partnership with Dallol Energy[2], and became operational in 2016[3].

Plant

The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia[2].

Tonnage Input/Fuel

The tonnage received by the plant is not reported in the most recent Annual Sustainability Report for 2018-19[4] by Ofgem or the SEPA data for the calendar year (i.e. January 2018 to December 2018).