Welland Bio Power

From WikiWaste
Revision as of 06:24, 9 August 2022 by Bin52 (talk | contribs)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 54715 0 0 -950 53765
2019 60673 0 0 -773 59900
2020 44379 0 0 -1005 43374
2021 42472 0 0 0 41429
2022 56951 0 0 0 56301


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 1783 3.32% 604 1.12%
2019 2319 3.87% 955 1.59%
2020 2245 5.18% 673 1.55%
2021 2013 4.86% 596 1.44%
2022 2090 3.71% 743 1.32%

Welland Bio Power. CoGen, 2018.
Welland Bio Power. CoGen, 2018.


[1]

Summary

A Biomass EfW facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of Wood Waste producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met[2].

The facility is located near Theddingworth in Northamptonshire. The Wood Waste feedstock is sourced locally through a contract with Welland Waste Management’s adjacent waste timber processing facility[2].

Welland Bio Power is operated by Nexterra and was developed by CoGen in partnership with Welland Waste Management. CoGen continues to provide management services[2].

Plant

The facility utilises Nexterra’s fixed-bed updraft gasification system technology, which is an Advanced Conversion Technology. MWH Treatment provided EPC services for the project[3].

The facility cost £51.6 million to develop and was financed by Balfour Beatty Investments, NOY Nexterra Holdings Limited Partnership (a partnership between NOY Infrastructure Fund and Nexterra) and Equitix MA Infrastructure Fund[3].

The facility replicates its sister project Birmingham Bio Power.

Tonnage Input/Fuel

The tonnage received by the plant is reported as Wood Waste in the most recent Annual Sustainability Report for 2018-19[4]. Because the plant is an Advanced Conversion Technology and produces a Syngas the sustainability report talks in terms of the gas input to the energy recovery system, rather than the unprocessed Wood Waste into the plant, which was 305,783,697 cubic meters. The Wood Waste is exclusively supplied by Welland Waste Management which sources much of the Wood Waste from Waste Disposal Authorities. The Wood Waste tonnage received and recorded in the EA statistics for the calendar year (i.e. January 2018 to December 2018) was 9,190 tonnes.