Deprecated: Use of Wikimedia\Rdbms\Database::factory was deprecated in MediaWiki 1.39. [Called from EDConnectorRdbms::connect in /home3/xxujagmy/public_html/.website_3a7ffd9c/extensions/ExternalData/includes/connectors/EDConnectorRdbms.php at line 35] in /home3/xxujagmy/public_html/.website_3a7ffd9c/includes/debug/MWDebug.php on line 382
Bolton TRF - WikiWaste

Bolton TRF

Revision as of 08:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Bolton TRF
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BS3042IM
Operator SUEZ
Region North West
Operational Capacity 107ktpa
Is site R1? No
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 10.80MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW Incineration
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 85800.00 588.00 0.00 0.00 86389.00
2017 49445.00 756.00 0.00 0.00 50202.00
2018 28179.00 1296.00 0.00 0.00 29476.00
2019 0.00 87489.00 0.00 0.00 88211.00
2020 65478.00 0.00 0.00 0.00 65478.00
2021 81388.00 0.00 0.00 0.00 81388.00
2022 72117.00 0.00 0.00 0.00 72117.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 17602.00 20.38% 3169.00 3.67%
2017 10607.00 21.13% 1927.00 3.84%
2018 3755.93 12.74% 711.44 2.41%
2019 16044.00 18.19% 3077.00 3.49%
2020 13670.00 20.88% 2159.00 3.30%
2021 11389.00 13.99% 1904.00 2.34%
2022 13294.00 18.43% 2131.00 2.95%

Summary

History

Plant

Local Authority Users

References