Cornwall ERC
| Cornwall ERC Operational | |
See Residual EfW → page for a larger UK Wide map. | |
| Waste Licence | GP3433GH |
| Operator | SUEZ |
| Region | South West |
| Operational Capacity | 240ktpa |
| Is site R1? | fal |
| When was R1 Granted? | 2020-02-03 |
| What was the R1 value | 0.76 |
| Electrical Capacity | 24.00MWe |
| Number of Lines | 2 |
| Number of Turbines | 1 |
| CHP | No |
| Technology Approach | EfW |
| Funding Type | PFI |
Operators Annual Report
Input Data
| Year | HH | C&I | Clin | RDF | Total |
|---|---|---|---|---|---|
| 2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2017 | 35830.10 | 0.00 | 12.08 | 151587.25 | 187429.43 |
| 2018 | 41681.71 | 0.00 | 223.36 | 179672.34 | 221577.41 |
| 2019 | 153899.00 | 89357.00 | 20.00 | 0.00 | 243276.00 |
| 2020 | 162489.00 | 82086.00 | 0.00 | 0.00 | 244575.00 |
| 2021 | 168449.00 | 78777.00 | 0.00 | 0.00 | 247226.00 |
| 2022 | 154896.00 | 90780.00 | 0.00 | 0.00 | 245676.00 |
| 2023 | 156149.00 | 87302.00 | 0.00 | 0.00 | 243451.00 |
Output Data
| Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
|---|---|---|---|---|
| 2016 | 0.00 | 0.00% | 0.00 | 0.00% |
| 2017 | 44012.64 | 23.48% | 4447.50 | 2.37% |
| 2018 | 41677.54 | 18.81% | 5705.32 | 2.57% |
| 2019 | 45524.00 | 18.71% | 6200.00 | 2.55% |
| 2020 | 47909.00 | 19.59% | 5613.00 | 2.30% |
| 2021 | 47041.00 | 19.03% | 5716.00 | 2.31% |
| 2022 | 43011.00 | 17.51% | 5092.00 | 2.07% |
| 2023 | 38473.00 | 15.80% | 5030.00 | 2.07% |