Eastcroft EfW (Lines 1 & 2)

From WikiWaste
Revision as of 08:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Eastcroft EfW (Lines 1 & 2)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence EP3034SN
Operator FCC Environment (WasteNotts)
Region East Midlands
Operational Capacity 200ktpa
Is site R1? No
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 9.00MWe
Number of Lines 2
Number of Turbines 0
CHP Yes
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 162541.00 7303.00 0.00 0.00 169844.00
2017 143360.00 7323.00 0.00 0.00 150683.00
2018 167348.00 9249.00 0.00 0.00 176597.00
2019 188117.00 96.00 0.00 0.00 188213.00
2020 191092.00 10.00 0.00 0.00 191102.00
2021 166944.00 19059.00 0.00 0.00 186003.00
2022 161633.00 20515.00 0.00 0.00 182148.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 34403.24 20.26% 4911.14 2.89%
2017 29304.00 19.45% 3899.00 2.59%
2018 35312.00 20.00% 4488.00 2.54%
2019 36654.00 19.47% 4728.00 2.51%
2020 37544.00 19.65% 4400.00 2.30%
2021 36250.00 19.49% 4194.00 2.25%
2022 34259.00 18.81% 3926.00 2.16%

Summary

History

Plant

Local Authority Users

References