Ardley EfW
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 218970.00 | 84655.50 | 0.00 | 0.00 | 303625.50 |
2017 | 206033.00 | 84687.00 | 0.00 | 0.00 | 290720.00 |
2018 | 141737.48 | 148341.84 | 0.00 | 0.00 | 290079.32 |
2019 | 186417.00 | 93364.00 | 0.00 | 0.00 | 279781.00 |
2020 | 214334.00 | 75730.00 | 0.00 | 0.00 | 290064.00 |
2021 | 226512.00 | 107015.00 | 0.00 | 0.00 | 333527.00 |
2022 | 223490.00 | 93664.00 | 0.00 | 0.00 | 317154.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 54472.00 | 17.94% | 6195.68 | 2.04% |
2017 | 65412.00 | 22.50% | 6105.12 | 2.10% |
2018 | 59299.00 | 20.44% | 6074.36 | 2.09% |
2019 | 46795.00 | 16.73% | 6006.00 | 2.15% |
2020 | 49558.00 | 17.09% | 6549.00 | 2.26% |
2021 | 67769.00 | 20.32% | 7228.00 | 2.17% |
2022 | 67267.00 | 21.21% | 6344.00 | 2.00% |
Summary
A Conventional Combustion ERF, Ardley has permitted operational capacity of 326,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and and the facility processes primarily residual Household Waste and some Commercial Waste[1]
History
The Ardley facility was built primarily to service a 25 year PPP contract signed in March 2011 with Oxfordshire County Council, with anticipated total throughput of up to 326,000 tonnes per annum - receiving additional residual Commercial Waste and some Household Waste from other local authorities. It is located on Viridor's Landfill near Bicester, close to the M40, and with the opening of the facility Viridor announced the closure of the adjacent Landfill in 2014.
Plant
Built by a JV between CNIM and Clugson under a Design & Build EPC-turnkey contract which started in March 2011 and was delivered in November 2014[2] at a reported [3] £220m capital cost. The plant comprises 2 lines of 20 tonnes/hour design capacity capable of treating 300,000 tonnes per annum via standard combustion technology generating super-heated steam, and is configured to run on primarily residual Household Waste