banneredit
2,363
edits
m (add new link) |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
[[Category:EfW Plants]] | {{#vardefine:epr|XP3730QZ}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An EfW facility based upon conventional [[combustion]] technology, located within the Merevale and Blyth Estate near Atherstone in Warwickshire. The facility is forecast to have a maximum capacity of 130,000 tonnes per annum, and to export 10.5 MW electricity to the grid after the facilities own power needs are met. The site will be [[CHP]]-ready with the potential to export hot water to a third party<ref name="ref1" >Environment Agency, 2018. [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/831258/Decision_Document.pdf Determination of an Application for an Environmental Permit under the Environmental Permitting (England & Wales) Regulations 2016. Online. [Accessed 21 Feb. 2020].]</ref>.{{EfWTemplate|EPR={{#var:epr}}|id=149}}__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== |