Drumgray Energy Recovery Centre (DERC)

Revision as of 05:57, 5 September 2022 by Bin52 (talk | contribs) (add page specific text)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

An EfW facility based upon conventional combustion technology, located at Greengairs in North Lanarkshire. The facility is forecast to have a capacity of 300,000 tonnes per annum and will export 25.5MW of electricity to the national grid[1].


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Drumgray EfW (DERC), North Lanarkshire, all rights reserved FCC
Drumgray EfW (DERC), North Lanarkshire, all rights reserved FCC


Summary

An EfW facility based upon conventional combustion technology, located at Greengairs in North Lanarkshire. The facility is forecast to have a capacity of 300,000 tonnes per annum and will export 25.5MW of electricity to the national grid. It is expected that the facility will become operational by early 2026 after announcing that construction commenced in August 2022[1].

Technology

The EfW will utilize single line air-cooled moving grate with standard combustion technology capable of burning 333,600 tonnes per annum, but with a design capacity of 300,000 tonnes per annum based on 8,000 hours at a throughput of 37.5 tonnes per hour at a NCV of 9.5MJ/kg. It is capable of generating c.30MWe asnd exporting c.27MWe and exporting up to 24.1MWth of heat[2].

Construction

The construction is reported to be by FCC Construction at a cost of around £350 million[3].

Waste Input

The facility is to be constructed on a merchant basis for non-hazardous residual waste, i.e. with no reliance on any long term contracts, in order to offer a solution pending the landfill ban in Scotland [4] which takes effect on 31st December 2025.

References