banneredit
2,363
edits
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|Tbc01}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).{{EfWTemplate|EPR={{#var:epr}}|id=45}}[[File:North London.png|400px|left|Image of North London Heat and Power]]__TOC__<br clear='left' /> | An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).{{EfWTemplate|EPR={{#var:epr}}|id=45}}[[File:North London.png|400px|left|Image of North London Heat and Power]]__TOC__<br clear='left' /> | ||