One of the largest [[ERF]] facilities in the UK, [[Runcorn EfW]] has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1">[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website]</ref> and in April 2021 it applied to received unprocessed residual [[MSW]] waste.
{{EfWTemplate|EPR={{#var: epr}}|id=1}}
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/ Runcorn EfW Site Photo]All Rights Reserved</ref>__TOC__
<br clear='left'/>


==Summary==
==Summary==
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website]</ref>
One of the largest [[ERF]] facilities in the UK, [[Runcorn EfW]] has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1" /> and in April 2021 it applied to received unprocessed residual [[MSW]] waste.


==History==
==History==
Line 12: Line 15:
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract. Phase 1 commenced in 2009 and was handed over in January 2015, and phase 2 commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3028 Keppel Sehers Website]</ref>.
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract. Phase 1 commenced in 2009 and was handed over in January 2015, and phase 2 commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3028 Keppel Sehers Website]</ref>.
The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising [[Keppel Segher]]'s proprietary water-cooled grates, generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg
The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising [[Keppel Segher]]'s proprietary water-cooled grates, generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg
 
{{EfWLAData|EPR={{#var:epr}}}}
==Local Authority Users==
{{EAIn|EPR={{#var:epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='RP3638CG'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
 
==References==
==References==
<references />
<references />