Runcorn EfW: Difference between revisions

no edit summary
(add EA permit return)
No edit summary
 
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{#vardefine: epr|RP3638CG}}
{{#vardefine: epr|XP3005LB}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
One of the largest [[ERF]] facilities in the UK, [[Runcorn EfW]] has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1">[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website]</ref>
One of the largest [[ERF]] facilities in the UK, [[Runcorn EfW]] has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1">[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website]</ref> and in April 2021 it applied to received unprocessed residual [[MSW]] waste.
{{EfWTemplate|EPR={{#var: epr}}|id=1}}
{{EfWTemplate|EPR={{#var: epr}}|id=1}}
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/ Runcorn EfW Site Photo]All Rights Reserved</ref>__TOC__
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/ Runcorn EfW Site Photo]All Rights Reserved</ref>__TOC__
Line 7: Line 7:


==Summary==
==Summary==
One of the largest [[ERF]] facilities in the UK, [[Runcorn EfW]] has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1" />
One of the largest [[ERF]] facilities in the UK, [[Runcorn EfW]] has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1" /> and in April 2021 it applied to received unprocessed residual [[MSW]] waste.


==History==
==History==
Line 15: Line 15:
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract. Phase 1 commenced in 2009 and was handed over in January 2015, and phase 2 commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3028 Keppel Sehers Website]</ref>.
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract. Phase 1 commenced in 2009 and was handed over in January 2015, and phase 2 commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3028 Keppel Sehers Website]</ref>.
The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising [[Keppel Segher]]'s proprietary water-cooled grates, generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg
The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising [[Keppel Segher]]'s proprietary water-cooled grates, generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg
 
{{EfWLAData|EPR={{#var:epr}}}}
==Local Authority Data==
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var:epr}}}}
{{EAIn|EPR={{#var:epr}}}}
==References==
==References==
<references />
<references />